Every builder gets asked this, and every honest answer starts the same way. Two houses with the same floor area can land a long way apart, because floor area is one of the smaller levers. What follows is what actually moves the number — and none of it can be resolved without looking at your drawings.
We have deliberately not published a cost-per-square-metre table. A single rate hides the very things that decide affordability, and a number quoted without seeing your plans is a guess wearing a suit.
> WHAT ACTUALLY DRIVES THE NUMBER
- Finish level
- The single biggest lever a client controls. The same floor plan built to an investor spec versus a luxury spec are different buildings financially — kitchens, tapware, glazing and joinery move the most.
- Site steepness
- Consistently the most under-estimated factor in custom homes. A steep site changes excavation, retaining, access, crane time and how long every trade takes to do the same work.
- Build type
- New build, extension, renovation or knock-down-rebuild. Working around an existing structure is slower per square metre than building new, and only new works should be priced.
- Size and shape
- Floor area drives the headline, but the perimeter-to-area ratio drives the envelope. A long thin plan costs more per square metre than a compact one with the same floor area.
- Region
- Labour availability, freight distance and subcontractor depth vary state to state, and the gap is widest on trades with thin local supply.
- Performance spec
- Airtightness, insulation, glazing and mechanical ventilation. A Passive House envelope is a materially different build to a code-minimum one.
> BY REGION
Labour depth, freight distance, climate spec and site character all vary. Pick your region for what matters locally:
- Cost to build in Tasmania
- Cost to build in Victoria
- Cost to build in New South Wales
- Cost to build in Queensland
- Cost to build in Western Australia
- Cost to build in South Australia
- Cost to build in the ACT
- Cost to build in New Zealand
The Northern Territory is not listed. We would rather say so than publish guidance we cannot stand behind.
> COMMON QUESTIONS
- How much does it cost to build a house in Australia?
- There is no single number, and any figure quoted without seeing your plans is a guess. The same floor area can differ enormously depending on finish level, how steep the site is, whether it is a new build or an extension, and where in the country it is. The honest answer comes from pricing your actual drawings.
- What is the biggest thing that changes the cost?
- Finish level and site steepness. Finish level is the lever a client controls — kitchens, tapware, glazing and joinery move the number most. Site steepness is the one most often under-estimated, because it slows every trade down, not just the excavation.
- Is a cost per square metre reliable?
- As a sanity check, sometimes. As a budget, no. A per-square-metre rate hides finish level, site conditions, plan shape and spec — the exact things that decide whether a project is affordable. Two houses with identical floor areas routinely land a long way apart.
- How do I get a number for my own plans?
- Upload them. Wundermator reads architectural PDFs, applies your build type, finish level and site steepness, and returns an indicative cost broken down by category in about 10 minutes.
- Is the result a quote?
- No. It is an indicative budget estimate for checking a design against a budget — not a builder's formal quote, and not a quantity surveyor's report. Always verify before committing.
> GET THE NUMBER FOR YOUR PLANS
Upload your architectural PDFs and get an indicative cost broken down by category in about 10 minutes — labour, materials and subcontractors, on rates calibrated against real back-costed builds.
Price my plansBuilding as a professional? See estimates for builders or feasibility reports for architects.